Going up! On May 22, 2018 by Tina Wyeth First floor steels being positioned ready for the beam and block first floor to be laid in Thurlestone.
Engineering solution for difficult to access site On February 19, 2018 by Tina Wyeth PCA recently designed a piled crane base strong enough to allow a large crane to lower and retrieve the plant and materials required for repair works to a jetty in Salcombe. The pictures show the plant being expertly and safely lowered into place.