Archive

Feb 2018

Engineering solution for difficult to access site

On
by Tina Wyeth

PCA recently designed a piled crane base strong enough to allow a large crane to lower and retrieve the plant and materials required for repair works to a jetty in Salcombe. The pictures show the plant being expertly and safely lowered into place.

Wear Red for RedR 2018

On
by Tina Wyeth

On Friday staff donned their best red outfits and took park in the annual Wear Red for RedR Day. Freshly baked cakes and raffle tickets were available by donation. The highlight was a lunchtime construction challenge. Using only spaghetti and marshmallows teams competed to build the tallest tower with Ross & Dafydd clear winners!

Over £100 was raised for RedR – take a look at their website to see the fantastic work they do to give NGOs, aid workers and communities the skills to prepare for, respond to and recover from major disasters like earthquakes, floods, conflict and drought. www.redr.org.uk